Hunter Quarries recently passed a process audit for the M1 Pacific Motorway Extension project with zero non-conformances. The audit covered our quality practices, including stockpile management, material sampling, testing, and traceability, ensuring compliance with Transport for NSW specifications.
Select material is critical for government and council-specified construction projects, ensuring that the engineering requirements of the Select Material Zone (SMZ) are met. Hunter Quarries provides high-quality select material products that comply with these specifications, ensuring the structural soundness of your project.
We supply the following select materials:
- SMZ (Select Material Zone): Complies with TfNSW specifications, providing strength and stability for engineered construction.
- SMZ20: With RFI approval, SMZ20 complies to TfNSW specifications and provides superior CBR results, resulting in premium strength and durability.
- Council Mix (Non-specified): Flexible select material for non-specified council projects.
- 20 or 40 Scalps: Cost-effective options for select material zone applications.
- Non-specified VENM Fills (Virgin Excavated Natural Material): Environmentally friendly fill material for construction projects.